HDD Gas Pipeline Installation
Trenchless installation of a 16-inch gas transmission line beneath interstate and railway crossings.
RP
Project Overview
This high-risk crossing package used HDD to install transmission infrastructure while preserving uninterrupted transportation operations.
Key Highlights
- Interstate and rail crossings executed without operational shutdowns
- Zero-incident safety performance
- Regulatory inspections passed first cycle
Delivery Challenges
- Constrained easement and traffic safety demands
- High consequence crossing tolerances
- Rig logistics and pullback force management